Product Facilities




Why Product Terminal

SUMED has completed the first phase of the gasoil facility project which included the retrofit of two existing floating roof tanks and the construction of truck loading facility for storage, loading, unloading and transportation of gasoil for EGPC to use for receiving and storing GASOIL in Ain Sukhna terminal then pumping it via a truck loading station. SUMED has provided the following dedicated system for EGPC for receiving, storing and transferring Gasoil:

• SBM3 to accommodate vessels up to 150,000 DWT

• 42“ diameter * 3.5 km Sea pipeline

• Internal land lines and associated fittings.

• Two floating roof tanks of capacity 103,000 m³ each complete with associated valves and fittings.

• Truck rack loading system consisting of 8 loading arms each capable of loading up to 100 m³ /hr each, complete with metering system and control.

• All electrical, instrumentation and control systems.

• Ancillaries, drain and sewer systems.
  •  

    SUMED has completed the first phase of the gasoil facility project which included the retrofit of two existing floating roof tanks and the construction of truck loading facility for storage, loading, unloading and transportation of gasoil for EGPC to use for receiving and storing GASOIL in Ain Sukhna terminal then pumping it via a truck loading station.

    SUMED has provided the following dedicated system for EGPC for receiving, storing and transferring Gasoil:

     

    ·SBM3 to accommodate vessels up to 150,000 DWT

    ·42“ diameter *  3.5 km Sea pipeline

    ·Internal land lines and associated fittings.

    ·Two floating roof tanks of capacity 103,000 m³ each complete with associated valves and  fittings.

    ·Truck rack loading system consisting of 8 loading arms each capable of loading up to 100 m³ /hr each, complete with metering system and control.

    ·All electrical, instrumentation and control systems.

    ·Ancillaries, drain and sewer systems.

 

Latest News |
Highlighter
Ain Sukhna Product Hub ASPH jetty contract - 2016-06-01
SUMED EGAS Contract - 2015-12-17
Ain Sukhna Product Hub ASPH - 2015-12-09
SUMED prepares for starting the detailed engineering of the LPG project - 2013-09-30
SUMED intends to develop a refined product and feedstock ... - 2013-08-15