Dahshour Station



An Intermediate Boosting Station located midway at Dahshour is used to increase the throughput from 80 to 117 million tons annually. Dahshour Intermediate station consists of six gas turbine driven pumps each of a capacity of 26 mega watt. Dahshour is the cornerstone for providing the highest degree of redundancy to SUMED operations as it contains a backup SCADA control that allows controlling and monitoring the pipeline system at the emergency control center.

 

 

Latest News |
Highlighter
Ain Sukhna Product Hub ASPH jetty contract - 2016-06-01
SUMED EGAS Contract - 2015-12-17
Ain Sukhna Product Hub ASPH - 2015-12-09
SUMED prepares for starting the detailed engineering of the LPG project - 2013-09-30
SUMED intends to develop a refined product and feedstock ... - 2013-08-15